Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 23, 2020, 06:27 PM
  • 21 0258_21 0257_09232020_114501.mp4

Date
09/23/2020
W/O
849680
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00763
PipeID
P15449
Time
11:27 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8052
Sewer Name
DISTRICT #21 OUTFALL TRUNK
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
36
Purpose
Routine Assessment
Project
WO_849680_TV21009_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
21 0258
Downstream MH
21 0257
Dir. of Survey
Downstream
Length Surveyed
525.2 ft.
Total Length
525.2 ft.
Structural Index
2
Structural Quick
2T00
Structural Rating
210
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
210
Pipe schematic from manhole 21 0258 to 21 0257
MH: 21 0258MH: 21 0257downstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 02580 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. MGO - General Observation - MAG COAT start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start525 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish525.1 ft. MGO - General Observation - MAG COAT END525.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK525.2 ft. AMH - Downstream Manhole, Survey Ends - 21 0257

Observations (11)

DistanceCodeObservation
525.2MGOCONNECTION AT MH 3 O'CLOCK
2MGOMAG COAT start
525.2AMH21 0257
0AMH21 0258
0MWL
2SSS
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM
525SSS
0MGOCONNECTION AT MH 9 O'CLOCK
525.1MGOMAG COAT END

Properties (7)

additional_info
412001
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-23T11:27:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false