Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 18, 2020, 05:00 AM
  • 08 0323_08 0322_09172020_221438.mp4

Date
09/17/2020
W/O
849661
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00013
PipeID
P00371
Time
10:00 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8041
Sewer Name
KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_849661_TV08155_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
08 0323
Downstream MH
08 0322
Dir. of Survey
Downstream
Length Surveyed
249.9 ft.
Total Length
250 ft.
Structural Index
3
Structural Quick
4I3I
Structural Rating
445
O&M Index
2
O&M Quick
2I00
O&M Rating
98
Overall Index
3
Overall Quick
Overall Rating
543
Pipe schematic from manhole 08 0323 to 08 0322
MH: 08 0323MH: 08 0322downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 03230 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - DROP CONN @ MH 9 O'CLOCK/ACTIVE2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"51.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN156.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN203.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"247 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish249 ft. MGO - General Observation - ROACHES @ MH250 ft. AMH - Downstream Manhole, Survey Ends - 08 0322250 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0MWM
2FM
250AMH08 0322
249MGOROACHES @ MH
51.9TFC
203.8TFC
2SSS
0MWL
250FM
2CM
2DAGS
156.1TFOPEN
247CM
250MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH08 0323
247SSS
0MGOROACHES @ MH
247DAGS
0MGODROP CONN @ MH 9 O'CLOCK/ACTIVE
9.9TFC
102.4TFOPEN

Properties (7)

additional_info
SC411954
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2020-09-17T22:00:18-07:00
documentation
PROPIPE
is_lateral_inspection
false