Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 18, 2020, 06:53 AM
  • 08 0318A_08 0318_09182020_000318.mp4

Date
09/17/2020
W/O
849661
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00013
PipeID
P00366
Time
11:53 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8041
Sewer Name
KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_849661_TV08155_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
08 0318A
Downstream MH
08 0318
Dir. of Survey
Downstream
Length Surveyed
243 ft.
Total Length
243 ft.
Structural Index
3
Structural Quick
4I3I
Structural Rating
432
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
3
Overall Quick
Overall Rating
528
Pipe schematic from manhole 08 0318A to 08 0318
MH: 08 0318AMH: 08 0318downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 0318A0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"68 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"118.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"170.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN221.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN240 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish240 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish243 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish243 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE243 ft. AMH - Downstream Manhole, Survey Ends - 08 0318

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
221.3TFOPEN
2SSS
0MWL
243FM
2.1FM
68TFC
2CM
0AMH08 0318A
240DAGS
240CM
243MGOCONN @ MH 9 O'CLOCK/ACTIVE
240SSS
0MWM
170.6TFOPEN
118.7TFC
19.4TFC
2DAGS
243AMH08 0318
0MGOCONN @ MH 9 O'CLOCK/ACTIVE

Properties (7)

additional_info
SC411954
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2020-09-17T23:53:04-07:00
documentation
PROPIPE
is_lateral_inspection
false