Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 18, 2020, 07:03 AM
  • 08 0318_08 0317_09182020_001459.mp4

Date
09/18/2020
W/O
849661
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00013
PipeID
P00365
Time
12:03 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8041
Sewer Name
KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_849661_TV08155_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
15 in.
Upstream MH
08 0318
Downstream MH
08 0317
Dir. of Survey
Downstream
Length Surveyed
327.6 ft.
Total Length
327.6 ft.
Structural Index
3
Structural Quick
4Y3L
Structural Rating
841
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
3
Overall Quick
Overall Rating
971
Pipe schematic from manhole 08 0318 to 08 0317
MH: 08 0318MH: 08 0317downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 03180 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN84.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN134.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"185 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"236.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN325 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE327.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. AMH - Downstream Manhole, Survey Ends - 08 0317

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2CM
327.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
0AMH08 0318
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
2FM
185TFC
32TFOPEN
325SSS
325FM
327.6FM
325DAGS
236.8TFOPEN
134.4TFC
2SSS
327.6AMH08 0317
325CM
84.7TFOPEN
7.4FM
0MWM
0MGOROACHES @ MH
0MWL

Properties (7)

additional_info
SC411954
custom_field_three
MULTIPLE FRACTURE'S
custom_field_two
2
customer
1
datetime
2020-09-18T00:03:54-07:00
documentation
PROPIPE
is_lateral_inspection
false