Wastewater/Activity/PacpInspection/1.0Sep 25, 2020, 04:49 AM
  • 08 0313_08 0312_09242020_215829.mp4

Date
09/24/2020
W/O
849661
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00013
PipeID
P00360
Time
9:49 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8048
Sewer Name
KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_849661_TV08155_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
8 in.
Upstream MH
08 0313
Downstream MH
08 0312
Dir. of Survey
Downstream
Length Surveyed
279.6 ft.
Total Length
279.6 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
278
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
282
Pipe schematic from manhole 08 0313 to 08 0312
MH: 08 0313MH: 08 0312downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 08 03130 ft. MGO - General Observation - ROACHES @ MH2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start26.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"77 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN125.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN178.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"244.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"277 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish277 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish279.6 ft. AMH - Downstream Manhole, Survey Ends - 08 0312279.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    279.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (17)

DistanceCodeObservation
0MWL
2CM
77TFOPEN
244.6TFC
277SSS
277DAGS
2SSS
279.6AMH08 0312
0MWM
279.6CM
0MGOCONN @ MH 3 O'CLOCK/UNKNOWN
178.8TFC
125.8TFOPEN
0AMH08 0313
2DAGS
26.5TFC
0MGOROACHES @ MH

Properties (7)

additional_info
SC411961
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-09-24T21:49:04-07:00
documentation
PROPIPE
is_lateral_inspection
false