Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2020, 05:19 PM
  • 29 0294_29 0287_09152020_104157.mp4

Date
09/15/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24204
Time
10:19 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7343
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0287
Downstream MH
29 0294
Dir. of Survey
Upstream
Length Surveyed
299.4 ft.
Total Length
299.4 ft.
Structural Index
2
Structural Quick
2K00
Structural Rating
118
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
236
Pipe schematic from manhole 29 0287 to 29 0294
MH: 29 0287MH: 29 0294upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 02942.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish17.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"20.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"67.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"69.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"102.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"114.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"115.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"196.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"196.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"199.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"297.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start297.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start299.4 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE299.4 ft. MWM - Water Mark, 15 %of cross sectional area299.4 ft. AMH - Downstream Manhole, Survey Begins - 29 0287299.4 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
281.8TFC
2DAGS
103TFC
231.9TFC
100TFC
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
299.4AMH29 0294
295.7DAGS
0MWM
183.7TFC
297SSS
0AMH29 0287
2SSS
102.6TFC
0MWL
279TFC
196.5TBA
230.1TFC
185.2TFC

Properties (8)

additional_info
SC411342
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-15T10:19:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
38930