Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2020, 03:35 PM
  • 29 0293_29 0292_09162020_085430.mp4

Date
09/16/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24203
Time
8:35 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7344
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0292
Downstream MH
29 0293
Dir. of Survey
Upstream
Length Surveyed
323.4 ft.
Total Length
323.4 ft.
Structural Index
2
Structural Quick
2L00
Structural Rating
128
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
130
Pipe schematic from manhole 29 0292 to 29 0293
MH: 29 0292MH: 29 0293upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 02930.4 ft. MGO - General Observation - ROACHES @ MH2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish5.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN41.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"43.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN91.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"104.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN137.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"145.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"193.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"196 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - HOLE IN CONN-VOID VISIBLE/OPEN239 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"241.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"285.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"287.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN303.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN321.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start323.4 ft. MWL - Water Level, 5 %of cross sectional area323.4 ft. AMH - Downstream Manhole, Survey Begins - 29 0292323.4 ft. MGO - General Observation - ROACHES @ MH323.4 ft. MWM - Water Mark, 10 %of cross sectional area

Observations (22)

DistanceCodeObservation
20.2TBOPEN
129.9TFC
2SSS
185.7TFC
321SSS
84.4TFC
0MWL
0AMH29 0292
0MGOROACHES @ MH
0MWM
127.4TFDHOLE IN CONN-VOID VISIBLE/OPEN
231.8TFC
323.4AMH29 0293
178.3TFC
35.9TFOPEN
38.2TFC
81.7TFC
280TFOPEN
219TFOPEN
282.2TFC
323MGOROACHES @ MH
317.7TFOPEN

Properties (8)

additional_info
SC411343
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-16T08:35:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39295