Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2020, 04:13 PM
  • 29 0291_29 0290 _09152020_093219.mp4

Date
09/15/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24201
Time
9:13 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7343
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0291
Downstream MH
29 0290
Dir. of Survey
Downstream
Length Surveyed
272.2 ft.
Total Length
272.2 ft.
Structural Index
2
Structural Quick
2J00
Structural Rating
108
O&M Index
2
O&M Quick
2J00
O&M Rating
108
Overall Index
2
Overall Quick
Overall Rating
216
Pipe schematic from manhole 29 0291 to 29 0290
MH: 29 0291MH: 29 0290downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 02912 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"38.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN75.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"93.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"157.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"170.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"175.6 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"217.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"268.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"270 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish270 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish272 ft. MGO - General Observation - ROACHES @ MH272.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0290

Observations (18)

DistanceCodeObservation
93.4TFC
170.8TBA
268.1TFC
272.2AMH29 0290
217.5TFC
157.3TFC
0MWM
0MWL
0AMH29 0291
270SSS
75.8TFC
2SSS
270DAGS
5.3TFA
175.6TFC
272MGOROACHES @ MH
2DAGS
38.6TFOPEN

Properties (8)

additional_info
SC411342
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-15T09:13:02-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39295