Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2020, 04:34 PM
  • 29 0290_29 0289 _09152020_095028.mp4

Date
09/15/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24200
Time
9:34 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7343
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0290
Downstream MH
29 0289
Dir. of Survey
Downstream
Length Surveyed
302.8 ft.
Total Length
302.8 ft.
Structural Index
2
Structural Quick
2K00
Structural Rating
120
O&M Index
2
O&M Quick
2K00
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
240
Pipe schematic from manhole 29 0290 to 29 0289
MH: 29 0290MH: 29 0289downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 02902 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"22.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"62.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"104.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"128.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"184.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"202.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"252.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"300 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish300 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302 ft. MGO - General Observation - ROACHES @ MH302.8 ft. AMH - Downstream Manhole, Survey Ends - 29 0289

Observations (18)

DistanceCodeObservation
0MGOROACHES @ MH
300DAGS
2DAGS
0MWM
252.8TFC
2SSS
302MGOROACHES @ MH
0MWL
6.1TFC
302.8AMH29 0289
104.6TFC
22.9TFC
62.2TFC
300SSS
184.8TFC
0AMH29 0290
128.1TFC
202.3TFC

Properties (8)

additional_info
SC411342
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2020-09-15T09:34:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39295