Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2020, 07:24 PM
  • 29 0289_29 0288_09152020_131647.mp4

Date
09/15/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24199
Time
12:24 PM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7343
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0288
Downstream MH
29 0289
Dir. of Survey
Upstream
Length Surveyed
360.3 ft.
Total Length
360.3 ft.
Structural Index
2
Structural Quick
2M00
Structural Rating
142
O&M Index
2
O&M Quick
312M
O&M Rating
147
Overall Index
2
Overall Quick
Overall Rating
289
Pipe schematic from manhole 29 0288 to 29 0289
MH: 29 0288MH: 29 0289upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 02890 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish91.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN135 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN152.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN201.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN219 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - 45% GREASE-LATERAL/OPEN262.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"284.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"293.7 ft. TBD - Tap Break-In Defective, at 01 o'clock, -, , within 8 inches of joint: YES, 4", 6" - BROKEN CONN/ACTIVE296.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN344.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN358.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start358.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start360.3 ft. MGO - General Observation - ROACHES @ MH360.3 ft. MWM - Water Mark, 15 %of cross sectional area360.3 ft. MWL - Water Level, 10 %of cross sectional area360.3 ft. AMH - Downstream Manhole, Survey Begins - 29 0288

Observations (20)

DistanceCodeObservation
75.6TFA
2SSS
358DAGS
141.3TFD45% GREASE-LATERAL/OPEN
0MGOROACHES @ MH
268.7TFOPEN
66.6TBDBROKEN CONN/ACTIVE
0MWM
225.3TFOPEN
358SSS
15.7TFOPEN
208TFOPEN
63.4TFOPEN
0MWL
158.4TFOPEN
360.3AMH29 0289
2DAGS
360.3MGOCONN @ MH 9 O'CLOCK/ACTIVE
98.2TFA
0AMH29 0288

Properties (8)

additional_info
SC411342
custom_field_three
SPALLING
custom_field_two
3
customer
1
datetime
2020-09-15T12:24:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39295