Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2020, 05:50 PM
  • 29 0279_29 0278_09162020_110542.mp4

Date
09/16/2020
W/O
850185
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24188
Time
10:50 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7344
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_850185_TV29040_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0279
Downstream MH
29 0278
Dir. of Survey
Downstream
Length Surveyed
331.6 ft.
Total Length
331.6 ft.
Structural Index
2
Structural Quick
2L00
Structural Rating
130
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
260
Pipe schematic from manhole 29 0279 to 29 0278
MH: 29 0279MH: 29 0278downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 02790 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start22.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"25.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"28.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN129.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"177.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"180.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"254 ft. MWM - Water Mark, 15 %of cross sectional area279.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"281.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"329 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish329 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish331.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE331.6 ft. AMH - Downstream Manhole, Survey Ends - 29 0278

Observations (18)

DistanceCodeObservation
2SSS
331.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
281.7TFC
331.6AMH29 0278
129.8TFC
22.8TFC
25.3TFC
2DAGS
254MWM
0AMH29 0279
180.3TFC
329DAGS
0MWL
279.2TFC
329SSS
28.8TBOPEN
0MWM
177.6TFC

Properties (8)

additional_info
SC411343
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-16T10:50:56-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39295