Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2020, 05:59 PM
  • 29 0286_29 0278_09172020_113025.mp4

Date
09/17/2020
W/O
849805
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24196
Time
10:59 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7345
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_849805_TV29120_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0286
Downstream MH
29 0278
Dir. of Survey
Downstream
Length Surveyed
340.3 ft.
Total Length
340.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 29 0286 to 29 0278
MH: 29 0286MH: 29 0278downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 02860 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start75.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"114.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN126.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"180.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN182.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN237.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN270.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN271.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN287 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 4"338 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340 ft. MGO - General Observation - CONN @ MH 4 O'CLOCK/ACTIVE340.3 ft. AMH - Downstream Manhole, Survey Ends - 29 0278

Observations (19)

DistanceCodeObservation
2CM
2SSS
338SSS
182.9TFOPEN
180.6TFOPEN
0AMH29 0286
75.4TFA
114.6TFOPEN
270.5TFOPEN
237.9TFOPEN
0MWM
0MWL
126.2TFC
287TB
340MGOCONN @ MH 4 O'CLOCK/ACTIVE
271.4TFOPEN
338CM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
340.3AMH29 0278

Properties (8)

additional_info
SC411344
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2020-09-17T10:59:46-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
39295