Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2020, 04:25 PM
  • 29 0283A_29 0283_09172020_094025.mp4

Date
09/17/2020
W/O
849805
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00375
PipeID
P24193
Time
9:25 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7345
Sewer Name
ORANGE AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_849805_TV29120_SEP2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0283A
Downstream MH
29 0283
Dir. of Survey
Downstream
Length Surveyed
291.7 ft.
Total Length
291.7 ft.
Structural Index
4
Structural Quick
4K3J
Structural Rating
403
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
403
Pipe schematic from manhole 29 0283A to 29 0283
MH: 29 0283AMH: 29 0283downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 0283A0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"64.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN66.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"90.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4" - OPEN95.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"152.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"192.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"194.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"201.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 4"216 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN261 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"289 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish291 ft. MGO - General Observation - ROACHES @ MH291.7 ft. AMH - Downstream Manhole, Survey Ends - 29 0283291.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
201.3TBA
289CM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
12.4TFC
90.4TFOPEN
0MWL
0AMH29 0283A
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
2FM
66.2TFC
2CM
261TFC
216TFOPEN
0MWM
291.7AMH29 0283
95.9TFA
64.1TFOPEN
152.7TFC
291.7FM
291MGOROACHES @ MH
192.5TFC
194.7TFC
0MGOROACHES @ MH

Properties (8)

additional_info
SC411344
custom_field_three
MULTIPLE FRACTURE
custom_field_two
2
customer
1
datetime
2020-09-17T09:25:24-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
39295