Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2020, 09:27 AM
  • C 0162A_C 0162_09222020_023533.mp4

Date
09/22/2020
W/O
850193
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00129
PipeID
P09675
Time
2:27 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8047
Sewer Name
JOINT OUTFALL C - UNIT 5B
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
12
Purpose
Routine Assessment
Project
WO_850193_TV19024_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
42 in.
Upstream MH
C 0162
Downstream MH
C 0162A
Dir. of Survey
Upstream
Length Surveyed
145.5 ft.
Total Length
145.5 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
140
O&M Index
2
O&M Quick
2E00
O&M Rating
56
Overall Index
2
Overall Quick
Overall Rating
196
Pipe schematic from manhole C 0162 to C 0162A
MH: C 0162MH: C 0162Aupstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Ends - C 0162A0.5 ft. MGO - General Observation - ROACHES @ MH2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish141.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start141.1 ft. MGO - General Observation - 70% MAG COAT143.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start143.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start145.5 ft. MWL - Water Level, 20 %of cross sectional area145.5 ft. AMH - Downstream Manhole, Survey Begins - C 0162145.5 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
145MGOROACHES @ MH
145.5SAP
145.5MGOCONN @ MH 3 O'CLOCK/UNKNOWN
4.4SAP
0MWL
0AMHC 0162
143SSS
145.5AMHC 0162A
2DAGS
0MWM
4.4MGO70% MAG COAT
2SSS
143DAGS

Properties (7)

additional_info
SC411960
custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-09-22T02:27:27-07:00
documentation
PROPIPE
is_lateral_inspection
false