Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2020, 05:51 AM
  • E 0025_E 0024_09152020_231257.mp4

Date
09/15/2020
W/O
849880
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00027
PipeID
P07606
Time
10:51 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8036
Sewer Name
JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_849880_TV30070_SEP2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
15 in.
Upstream MH
E 0025
Downstream MH
E 0024
Dir. of Survey
Downstream
Length Surveyed
482.3 ft.
Total Length
482.3 ft.
Structural Index
3
Structural Quick
5A3R
Structural Rating
338
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
338
Pipe schematic from manhole E 0025 to E 0024
MH: E 0025MH: E 0024downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00250 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - 80% MAG COAT2.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN50.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish428.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN481.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish482.3 ft. AMH - Downstream Manhole, Survey Ends - E 0024

Observation photos (2)

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
50.1SRV
0AMHE 0025
2.1SRV
2.1SAP
428.5TFOPEN
0MWM
0MWL
2MGO80% MAG COAT
482.3AMHE 0024
15.1TFOPEN
481.5SAP

Properties (7)

additional_info
SC411849
custom_field_three
AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-09-15T22:51:13-07:00
documentation
PROPIPE
is_lateral_inspection
false