Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2020, 09:59 AM
  • 32 1310_32 1309_09162020_031326.mp4

Date
09/16/2020
W/O
844702
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19689
Time
2:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7994
Sewer Name
SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
11
Purpose
Routine Assessment
Project
WO_844702_TV32040_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 1310
Downstream MH
32 1309
Dir. of Survey
Downstream
Length Surveyed
417.8 ft.
Total Length
417.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412P
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
170
Pipe schematic from manhole 32 1310 to 32 1309
MH: 32 1310MH: 32 1309downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 13102 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start350.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"415.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish417.8 ft. AMH - Downstream Manhole, Survey Ends - 32 1309

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
350.9TFC
415.6DAGS
2DAGS
0MWL
0AMH32 1310
417.8AMH32 1309

Properties (8)

additional_info
SC411886
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2020-09-16T02:59:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
32808