Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 2, 2020, 11:16 AM
  • 15 0776_15 0775_1022020_042555.mp4

Date
10/02/2020
W/O
0855540
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00593
PipeID
P12977
Time
4:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1576R
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Maintenance Related
Project
20201002MDM_ARCADIA_SIERRA_MADRE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0776
Downstream MH
15 0775
Dir. of Survey
Downstream
Length Surveyed
399.3 ft.
Total Length
399.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3127
O&M Rating
17
Overall Index
2
Overall Quick
Overall Rating
17
Pipe schematic from manhole 15 0776 to 15 0775
MH: 15 0776MH: 15 0775downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:20AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area90 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open=90% ROOTS95.3 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-99 ROOTS97.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open119.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - CAPPED122.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped143.2 ft. RMC - Roots Medium Connection, from 01 to 03 o'clock, 5 %, within 8 inches of joint: YES143.2 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-99% ROOTS147 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open=90% ROOTS168.3 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-99% ROOTS217 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open232.2 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-99% ROOTS235.3 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-80% ROOTS244.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped251 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active317.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open399.3 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observations (20)

DistanceCodeObservation
0MWL
251TFActive
0AMH4:20AM
217TFOpen
0MGOConn. @ Mh, 3 O' Clock. ACTIVE
147TFDOpen=90% ROOTS
244.5TFCCapped
235.3TFDOpen-80% ROOTS
317.5TFOpen
0MWM
97.9TFOpen
232.2TFDOpen-99% ROOTS
90TFDOpen=90% ROOTS
399.3AMH4:45AM
119.6TFCCAPPED
143.2RMC
168.3TFDOpen-99% ROOTS
122.7TFCCapped
95.3TFDOpen-99 ROOTS
143.2TFDOpen-99% ROOTS

Properties (5)

additional_info
POST ROOT EVALUATION ONLY
customer
LACSD
datetime
2020-10-02T04:16:40-07:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection
false