4_1_2_05102020_045718.mp4
2 ft. - General Observation - MAG COAT 90% START
12.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
12.1 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
18.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
26.5 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
46.2 ft. - General Observation - POSSIBLE LINED SECTIONS OF PIPE OR NEWER PIPE
56.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES
86.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 165.6 | AMH | 5:15AM |
| 165.2 | MGO | 90% MAG COAT |
| 141.3 | TFC | STUB |
| 46.2 | MGO | POSSIBLE LINED SECTIONS OF PIPE OR NEWER PIPE |
| 12.1 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 56.4 | DAGS | — |
| 12.1 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 165.2 | SAM | SEVERE AGG |
| 0 | AMH | 4:55AM |
| 26.5 | SRC | CIRCUM REBAR |
| 18.4 | SRC | CIRCUM REBAR |
| 133.5 | TFC | STUB |
| 165.2 | SRC | CIRCUM REBAR |
| 2 | MGO | MAG COAT 90% START |
| 165.2 | MGO | MH CONN 3:00 ACTIVE |
| 86.4 | SRC | CIRCUM REBAR |
| 165.2 | SSS | BLISTERING PEELING CONCRETE |