3_1_2_05102020_040703.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 95% START
10.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
14 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
40.8 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - SLUDGE
230 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
317.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE VAGG
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 14 | SSS | BLISTERING PEELING CONCRETE |
| 332.2 | SRC | CIRCUM REBAR |
| 2 | SAM | SEVERE AGG |
| 0 | AMH | 4:05AM |
| 0 | MWL | — |
| 332.2 | MGO | 95% MAG COAT FINISH |
| 10.7 | SRC | CIRCUM REBAR |
| 332.7 | AMH | 4:35AM |
| 332.2 | SAM | SEVERE AGG |
| 40.8 | DSZ | SLUDGE |
| 2 | MGO | MAG COAT 95% START |
| 0 | MGO | MH CONN 3:00 ACTIVE |
| 317.5 | SAM | SEVERE VAGG |
| 0 | MWM | — |
| 230 | SAM | SEVERE AGG |
| 0 | MGO | MH CONN 9:00 OPEN |
| 332.2 | SSS | BLISTERING PEELING CONCRETE |