Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 15, 2020, 10:23 AM
  • 32 1169_32 1168 _09152020_033827.mp4

Date
09/15/2020
W/O
844698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19623
Time
3:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7990
Sewer Name
SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_844698_TV32021_AUG2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1169
Downstream MH
32 1168
Dir. of Survey
Downstream
Length Surveyed
405.2 ft.
Total Length
405.2 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
400
O&M Index
2
O&M Quick
312O
O&M Rating
163
Overall Index
2
Overall Quick
Overall Rating
563
Pipe schematic from manhole 32 1169 to 32 1168
MH: 32 1169MH: 32 1168downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11690 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start58.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.9 ft. RMJ - Roots Medium Joint, from 04 to 08 o'clock, 10 %, within 8 inches of joint: YESR225 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"403.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish403.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish403.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish405.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1168

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Joint, from 04 to 08 o'clock, 10 %, within 8 inches of joint: YESR

    97.9 ft. - Roots Medium Joint, from 04 to 08 o'clock, 10 %, within 8 inches of joint: YESR

Observations (14)

DistanceCodeObservation
0MWL
229.7TFC
2DAGS
403.7SAP
58.8TFC
403.7DAGS
2.5SSS
403.7SSS
97.9RMJ
2SAP
0AMH32 1169
0MWM
225TFA
405.2AMH32 1168

Properties (6)

additional_info
SC411882
custom_field_two
2
customer
1
datetime
2020-09-15T03:23:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false