Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 17, 2020, 04:40 AM
  • 32 1166_32 1165_09162020_214851.mp4

Date
09/16/2020
W/O
844698
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19620
Time
9:40 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7995
Sewer Name
SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_844698_TV32021_AUG2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1165
Downstream MH
32 1166
Dir. of Survey
Upstream
Length Surveyed
172.3 ft.
Total Length
172.3 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
42
O&M Index
2
O&M Quick
2F00
O&M Rating
68
Overall Index
2
Overall Quick
Overall Rating
110
Pipe schematic from manhole 32 1165 to 32 1166
MH: 32 1165MH: 32 1166upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11661.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish101.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish101.9 ft. MMC - Material Change, Vitrified clay pipe135.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start170.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start172.3 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK172.3 ft. AMH - Downstream Manhole, Survey Begins - 32 1165172.3 ft. MWM - Water Mark, 20 %of cross sectional area172.3 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    70.4 ft. - Material Change, Vitrified clay pipe

Observations (11)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK
0AMH32 1165
172.3AMH32 1166
0MWM
170.6DAGS
2SAP
0MWL
36.6TFC
70.4SAP
70.4MMC
2DAGS

Properties (7)

additional_info
SC411887
custom_field_three
PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-09-16T21:40:33-07:00
documentation
PRO PIPE
is_lateral_inspection
false