32 1170_32 1169_09152020_031542.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
210.7 ft. - Roots Fine Connection, from 01 to 04 o'clock, within 8 inches of joint: YES
265.3 ft. - Roots Fine Joint, from 04 to 08 o'clock, within 8 inches of joint: YESR
334.8 ft. - Material Change, Cast Iron
334.8 ft. - Surface Corrosion Metal Pipe, from 12 to 12 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 406.8 | DAGS | — |
| 0 | AMH | 32 1170 |
| 212 | MWL | — |
| 334.8 | MMC | — |
| 334.8 | SAP | — |
| 2 | DAGS | — |
| 0 | MWL | — |
| 265.3 | RFJ | — |
| 2 | SAP | — |
| 406.8 | SCP | — |
| 334.8 | SCP | — |
| 334 | SSS | — |
| 210.7 | RFC | — |
| 214.6 | TFC | — |
| 2 | SSS | — |
| 0 | MWM | — |
| 2 | MGO | 35% MAG COAT |
| 408.5 | AMH | 32 1169 |
| 227.6 | DSZ | DEBRIS |
| 210.7 | TFA | — |
| 406.8 | DSZ | — |