Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2020, 04:49 AM
  • 14 0291_14 1130_09152020_220500.mp4

Date
09/15/2020
W/O
844414
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00583
PipeID
P26317
Time
9:49 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7992
Sewer Name
TRUNK "F"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_844414_TV14076_AUG2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
14 0291
Downstream MH
14 1130
Dir. of Survey
Downstream
Length Surveyed
304.4 ft.
Total Length
304.4 ft.
Structural Index
3
Structural Quick
5C3K
Structural Rating
405
O&M Index
2
O&M Quick
412K
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
529
Pipe schematic from manhole 14 0291 to 14 1130
MH: 14 0291MH: 14 1130downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 14 02910 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start169.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start272.7 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish302.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish302.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish302.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish304.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE304.4 ft. AMH - Downstream Manhole, Survey Ends - 14 1130

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    169.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2SAP
302.3SAP
302.3DAGS
302.3SSS
2SSS
0MWM
0MGOROACHES @ MH
272.7SRV
2MGO65% MAG COAT
304.4MGOCONN @ MH 9 O'CLOCK/ACTIVE
2DAGS
0AMH14 0291
304.4AMH14 1130
169.8SRV
0MWL

Properties (7)

additional_info
SC411883
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE/SPALLIN
custom_field_two
2
customer
1
datetime
2020-09-15T21:49:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false