C 0106_C 0105_9252020_035040.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - General Observation - MAG COAT 85% START 11:00 TO 1:00
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
163.7 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING PEEL;ING CONCRETE UNDER MAG COAT
264.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
457.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
562.2 ft. - General Observation - DEBRIE ON CABLE
| Distance | Code | Observation |
|---|---|---|
| 457.9 | SSS | BLISTERING PEELING CONCRETE |
| 562.2 | MGO | MAG COAT 85% FINISH |
| 0 | AMH | 3:55AM |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 264.3 | SSS | BLISTERING PEELING CONCRETE |
| 2 | MGO | MAG COAT 85% START 11:00 TO 1:00 |
| 163.7 | SSS | BLISTERING PEEL;ING CONCRETE UNDER MAG COAT |
| 562.9 | AMH | 4:45AM |
| 562.2 | DAGS | — |
| 562.2 | SSS | BLISTERING PEELING CONCRETE |
| 562.2 | MGO | DEBRIE ON CABLE |
| 2 | DAGS | — |
| 0 | MWL | — |