Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 22, 2020, 11:43 AM
  • 02 1132_02 1131_9222020_045124.mp4

Date
09/22/2020
W/O
0849658
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00351
PipeID
P02914
Time
4:43 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1567
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Maintenance Related
Project
20200921MDM_GARFIELD_AVENUE_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
02 1132
Downstream MH
02 1131
Dir. of Survey
Downstream
Length Surveyed
257.6 ft.
Total Length
257.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4114
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 02 1132 to 02 1131
MH: 02 1132MH: 02 1131downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWM - Water Mark, 50 %of cross sectional area43.8 ft. RFJ - Roots Fine Joint, at 09 o'clock, within 8 inches of joint: YESR - 1%71.1 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 1%93.1 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 2%257.1 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 3% OR LESS THROUGHOUT REACH257.6 ft. AMH - Downstream Manhole, Survey Ends - 5:05AM

Observations (9)

DistanceCodeObservation
0AMH4:50AM
257.6AMH5:05AM
0MWL
93.1RFJ2%
0MGOConn. @ Mh, 3 O' Clock. OPEN
71.1RFJ1%
0MWM
43.8RFJ1%
257.1RFJ3% OR LESS THROUGHOUT REACH

Properties (5)

additional_info
POST CLEANING EVALUATION ONLY
customer
LACSD
datetime
2020-09-22T04:43:45-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false