Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2020, 08:05 AM
  • C 0426_C 0425_9282020_012252.mp4

Date
09/28/2020
W/O
0849558
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00121
PipeID
P09548
Time
1:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1573
Sewer Name
C JOINT OUTFALL C - UNIT 3B AND 3B RELIEF
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
18
Purpose
Routine Assessment
Project
20200928MDM_JOINT_OUTFALL_C_UNIT_3B_AND_3B_RELIEF
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
C 0426
Downstream MH
C 0425
Dir. of Survey
Downstream
Length Surveyed
451.8 ft.
Total Length
451.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole C 0426 to C 0425
MH: C 0426MH: C 0425downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:30AM8 ft. MGO - General Observation - 60" RCP& FR POLY LINER15.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start208.4 ft. MGO - General Observation - FR POLY LINER370.6 ft. MGO - General Observation - 60" RCP-FR POLY LINER381.3 ft. MGO - General Observation - FR POLY LINER451.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish451.8 ft. AMH - Downstream Manhole, Survey Ends - 2:00AM

Observation photos (5)

  • General Observation - 60" RCP& FR POLY LINER

    8 ft. - General Observation - 60" RCP& FR POLY LINER

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    15.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - FR POLY LINER

    208.4 ft. - General Observation - FR POLY LINER

  • General Observation - 60" RCP-FR POLY LINER

    370.6 ft. - General Observation - 60" RCP-FR POLY LINER

  • General Observation - FR POLY LINER

    381.3 ft. - General Observation - FR POLY LINER

Observations (10)

DistanceCodeObservation
381.3MGOFR POLY LINER
370.6MGO60" RCP-FR POLY LINER
15.5DAGS
451.3DAGS
0MWM
0MWL
451.8AMH2:00AM
8MGO60" RCP& FR POLY LINER
208.4MGOFR POLY LINER
0AMH1:30AM

Properties (8)

custom_field_three
FR POLY LINER GOOD CONDITION
custom_field_two
4
customer
LACSD
datetime
2020-09-28T01:05:55-07:00
documentation
MARTIN,OLIVER 111,BARR,CASTILLO
is_lateral_inspection
false
lining
FR POLY LINE
year_laid
19980819