Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2020, 04:50 AM
  • 01 0275_01 0274_09082020_220734.mp4

Date
09/08/2020
W/O
844481
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01323
Time
9:50 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8029
Sewer Name
SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
WO_844481_TV01060_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
01 0275
Downstream MH
01 0274
Dir. of Survey
Downstream
Length Surveyed
325.1 ft.
Total Length
325.1 ft.
Structural Index
3
Structural Quick
4L3L
Structural Rating
579
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
3
Overall Quick
Overall Rating
707
Pipe schematic from manhole 01 0275 to 01 0274
MH: 01 0275MH: 01 0274downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02750 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start72.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN106.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN124.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN131.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"158.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"172.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN180.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"197 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN207.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"224 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - TAPE IN LATERAL234.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"258 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"323 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish323 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish323 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE325.1 ft. AMH - Downstream Manhole, Survey Ends - 01 0274

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    72.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN

    124.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6" - OPEN

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - TAPE IN LATERAL

    224 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - TAPE IN LATERAL

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

    250.8 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"

Observations (29)

DistanceCodeObservation
224TBATAPE IN LATERAL
0MWL
0AMH01 0275
82.3TFC
2FM
325.1CM
180.5TFC
258TFC
2SSS
98.2TBOPEN
172.7TBOPEN
207.2TFC
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
323DAGS
158.1TFA
234.3TFC
2CM
323FM
2DAGS
325.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
323SSS
72.3TBA
131.1TFC
197TBOPEN
0MWM
325.1AMH01 0274
250.8TBA
106.4TFOPEN
124.2TBOPEN

Properties (7)

additional_info
SC411842
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-09-08T21:50:59-07:00
documentation
PROPIPE
is_lateral_inspection
false