Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2020, 06:22 AM
  • 01 0271_01 0270_09082020_233531.mp4

Date
09/08/2020
W/O
844481
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01319
Time
11:22 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8029
Sewer Name
SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
09
Purpose
Routine Assessment
Project
WO_844481_TV01060_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
01 0271
Downstream MH
01 0270
Dir. of Survey
Downstream
Length Surveyed
332 ft.
Total Length
332 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
462
Pipe schematic from manhole 01 0271 to 01 0270
MH: 01 0271MH: 01 0270downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 01 02710 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start98.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN142 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"193.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"226.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"276.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"330 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE332 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish332 ft. AMH - Downstream Manhole, Survey Ends - 01 0270

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
332MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
2DAGS
330SSS
98.2TFOPEN
2SSS
0MGOROACHES @ MH
226.5TFC
142TFC
252.7TFC
332CM
166.4TFC
332AMH01 0270
0AMH01 0271
193.6TFC
0MWM
0MGOCONN @ MH 9 O'CLOCK/CAPPED
276.9TFC
2CM
330DAGS

Properties (6)

additional_info
SC411842
custom_field_two
3
customer
1
datetime
2020-09-08T23:22:29-07:00
documentation
PROPIPE
is_lateral_inspection
false