Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 1, 2020, 05:43 AM
  • 08 0481_08 0480_08312020_225654.mp4

Date
08/31/2020
W/O
844358
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00007
PipeID
P00539
Time
10:43 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8012
Sewer Name
FRAMPTON AVENUE TRUNK
City
HARBOR CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
16
Purpose
Routine Assessment
Project
WO_844358_TV08086_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
36 in.
Upstream MH
08 0480
Downstream MH
08 0481
Dir. of Survey
Upstream
Length Surveyed
282.3 ft.
Total Length
282.3 ft.
Structural Index
3
Structural Quick
3G22
Structural Rating
130
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
130
Pipe schematic from manhole 08 0480 to 08 0481
MH: 08 0480MH: 08 0481upstream0 ft. MGO - General Observation - CONNECTION IN MH, 9 O' CLOCK0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 08 04810 ft. MGO - General Observation - CONNECTION IN MH, 3 O' CLOCK capped14.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"39.7 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"64.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"165 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"209.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start215.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"260.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"264.3 ft. CS - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES279 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES282.3 ft. AMH - Downstream Manhole, Survey Begins - 08 0480282.3 ft. MWL - Water Level, 5 %of cross sectional area282.3 ft. MWM - Water Mark, 5 %of cross sectional area

Observation photos (4)

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    3.3 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

    18 ft. - Crack Spiral, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    72.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    242.6 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"

Observations (18)

DistanceCodeObservation
267.5TFC
72.9CM
217.5TFC
0AMH08 0480
80.2TF
242.6TB
282.3MGOCONNECTION IN MH, 9 O' CLOCK
167.2TFC
282.3CM
21.4TFC
18CS
282.3AMH08 0481
3.3CL
0MWL
0MWM
66.8TFC
117.3TFC
282.3MGOCONNECTION IN MH, 3 O' CLOCK capped

Properties (7)

additional_info
SC411825
custom_field_three
MINOR CRACKING
custom_field_two
3
customer
1
datetime
2020-08-31T22:43:55-07:00
documentation
PROPIPE
is_lateral_inspection
false