Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 1, 2020, 09:59 AM
  • 08 0632_08 0631 _09012020_031300.mp4

Date
09/01/2020
W/O
844778
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00018
PipeID
P00632
Time
2:59 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8013
Sewer Name
SEPULVEDA BOULEVARD TRUNK
City
CARSON
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
13
Purpose
Routine Assessment
Project
WO_844778_TV08027_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
15 in.
Upstream MH
08 0632
Downstream MH
08 0631
Dir. of Survey
Downstream
Length Surveyed
186.4 ft.
Total Length
186.4 ft.
Structural Index
3
Structural Quick
3F00
Structural Rating
99
O&M Index
3
O&M Quick
3321
O&M Rating
11
Overall Index
3
Overall Quick
Overall Rating
110
Pipe schematic from manhole 08 0632 to 08 0631
MH: 08 0632MH: 08 0631downstream0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 06323.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start157.2 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES157.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish162.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES162.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES171.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - SLUDGE186.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish186.4 ft. MSA - Survey Abandoned - CAM BLKD BY DEBRIS/SLUDGE 25%

Observation photos (5)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    157.2 ft. - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    162.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start - SLUDGE

    171.4 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - SLUDGE

  • Survey Abandoned - CAM BLKD BY DEBRIS/SLUDGE 25%

    186.4 ft. - Survey Abandoned - CAM BLKD BY DEBRIS/SLUDGE 25%

Observations (11)

DistanceCodeObservation
157.2FL
162.4DSC
186.4DSZ
162.4CM
0MWM
3.6CM
171.4DSZSLUDGE
186.4MSACAM BLKD BY DEBRIS/SLUDGE 25%
0MWL
157.2CM
0AMH08 0632

Properties (8)

additional_info
SC411826
custom_field_three
MSA
custom_field_two
5
customer
1
datetime
2020-09-01T02:59:09-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
31742