Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 29, 2020, 06:36 AM
  • 22 0953_22 0952_07282020_235101.mp4

Date
07/28/2020
W/O
844703
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00790
PipeID
P17323
Time
11:36 PM
Certificate
U-111-11880
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7887
Sewer Name
BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
WO_844703_TV22003_AUG2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0953
Downstream MH
22 0952
Dir. of Survey
Downstream
Length Surveyed
362.1 ft.
Total Length
362.1 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
360
O&M Index
2
O&M Quick
2N00
O&M Rating
146
Overall Index
2
Overall Quick
Overall Rating
506
Pipe schematic from manhole 22 0953 to 22 0952
MH: 22 0953MH: 22 0952downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 09532 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT63.3 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 6" - ACTIVE143.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"193.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"359.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish359.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish359.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish362.1 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE362.1 ft. MGO - General Observation - ROACHES @ MH362.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0952

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    362.1 ft. - General Observation - ROACHES @ MH

Observations (17)

DistanceCodeObservation
2SAP
2DAGS
0MGOROACHES @ MH
359.8SAP
362.1MGOCONN @ MH 3 O' CLOCK/ACTIVE
2SSS
0MWM
63.3TBIACTIVE
359.8SSS
362.1MGOROACHES @ MH
0MWL
2MGO65% MAG COAT
359.8DAGS
362.1AMH22 0952
143.2TFA
0AMH22 0953
193.7TBA

Properties (7)

additional_info
SC411727
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-07-28T23:36:32-07:00
documentation
PRO PIPE
is_lateral_inspection
false