Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2020, 09:11 AM
  • 01 1008_01 1007_09082020_022435.mp4

Date
09/08/2020
W/O
844360
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00221
PipeID
P01854
Time
2:11 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8027
Sewer Name
VERNON EXTENSION TRUNK
City
VERNON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_844360_TV01271_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
27 in.
Upstream MH
01 1008
Downstream MH
01 1007
Dir. of Survey
Downstream
Length Surveyed
314.2 ft.
Total Length
314.2 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
310
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
436
Pipe schematic from manhole 01 1008 to 01 1007
MH: 01 1008MH: 01 1007downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 10080 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start13.7 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN27.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"30.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN127.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"131.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN210.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN229.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"231.9 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 40$ GREASE-LATERAL/OPEN312 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish312 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish314 ft. MGO - General Observation - ROACHES @ MH314.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN314.2 ft. AMH - Downstream Manhole, Survey Ends - 01 1007

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    13.7 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

    86.8 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6" - OPEN

Observations (23)

DistanceCodeObservation
2CM
200.9TFOPEN
2SSS
210.7TFOPEN
13.7TBOPEN
131.8TFC
231.9TFD40$ GREASE-LATERAL/OPEN
0MGOROACHES @ MH
312DAGS
312CM
0MWM
86.8TBOPEN
2DAGS
0AMH01 1008
314MGOROACHES @ MH
314.1MGOCONN @ MH 9 O'CLOCK/OPEN
229.9TFC
314.2AMH01 1007
27.2TFC
0MWL
127.9TFC
312SSS
30.4TFC

Properties (7)

additional_info
SC411840
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-09-08T02:11:09-07:00
documentation
PROPIPE
is_lateral_inspection
false