Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 8, 2020, 10:30 AM
  • 01 1003A_01 1003_09082020_033425.mp4

Date
09/08/2020
W/O
844360
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00221
PipeID
P01848
Time
3:30 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8027
Sewer Name
VERNON EXTENSION TRUNK
City
VERNON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_844360_TV01271_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
27 in.
Upstream MH
01 1003A
Downstream MH
01 1003
Dir. of Survey
Downstream
Length Surveyed
85.9 ft.
Total Length
85.9 ft.
Structural Index
2
Structural Quick
3B2B
Structural Rating
77
O&M Index
2
O&M Quick
2B00
O&M Rating
32
Overall Index
2
Overall Quick
Overall Rating
109
Pipe schematic from manhole 01 1003A to 01 1003
MH: 01 1003AMH: 01 1003downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 1003A0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"20.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish83 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish85 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish85.9 ft. AMH - Downstream Manhole, Survey Ends - 01 100385.9 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/OPEN85.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
19.7TFC
85.9AMH01 1003
83DAGS
85.9MGOCONN @ MH 9 O'CLOCK/OPEN
0AMH01 1003A
0MWM
0MGOROACHES @ MH
20.7TFC
10.6CM
2SSS
85.9MGOCONN @ MH 3 O'CLOCK/OPEN
2DAGS
83SSS
85CM
0MWL

Properties (7)

additional_info
SC411840
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-09-08T03:30:19-07:00
documentation
PROPIPE
is_lateral_inspection
false