Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2016, 07:22 AM
  • BLANK_08 0155_7272016_002630.mp4

Date
07/27/2016
W/O
0574374
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00006
PipeID
P00212
Time
12:22 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0207
Sewer Name
08 FIGUEROA STREET TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
01
Purpose
Routine Assessment
Project
20160723MDM_FIGUEROA_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
08 0155
Downstream MH
BLANK
Dir. of Survey
Upstream
Length Surveyed
59.8 ft.
Total Length
59.8 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 08 0155 to BLANK
MH: 08 0155MH: BLANKupstream0 ft. AMH - Upstream Manhole, Survey Ends - 12:50AM0.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - MUDD0.2 ft. MGO - General Observation - STOPLOG DOWNSTREAM-APPOX 80'4.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - PLASTIC BOTTLE18.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped22.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MUDD51.8 ft. MGO - General Observation - 12" VCP57.3 ft. FC - Fracture Circumferential, from 05 to 06 o'clock, within 8 inches of joint: NO - SLIGHT59.8 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped59.8 ft. MWM - Water Mark, 5 %of cross sectional area59.8 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW59.8 ft. AMH - Downstream Manhole, Survey Begins - 12:25AM

Observation photos (5)

  • Fracture Circumferential, from 05 to 06 o'clock, within 8 inches of joint: NO - SLIGHT

    2.5 ft. - Fracture Circumferential, from 05 to 06 o'clock, within 8 inches of joint: NO - SLIGHT

  • General Observation - 12" VCP

    8 ft. - General Observation - 12" VCP

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - MUDD

    37.2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - MUDD

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO - PLASTIC BOTTLE

    55.3 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - PLASTIC BOTTLE

  • Upstream Manhole, Survey Ends - 12:50AM

    59.8 ft. - Upstream Manhole, Survey Ends - 12:50AM

Observations (12)

DistanceCodeObservation
0MGOConn. @ Mh, 9 O' Clock. Capped
0MWM
55.3DSZPLASTIC BOTTLE
41.3TFCCapped
0MWLNO FLOW
0AMH12:25AM
59.6DSZMUDD
37.2DSZMUDD
2.5FCSLIGHT
8MGO12" VCP
59.6MGOSTOPLOG DOWNSTREAM-APPOX 80'
59.8AMH12:50AM

Properties (6)

custom_field_three
1 SLIGHT CIRCUM FRACTURE
custom_field_two
4
customer
LACSD
datetime
2016-07-27T00:22:04-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false