Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2016, 07:55 AM
  • 08 0153_08 0152_7182016_053138.mp4

Date
07/18/2016
W/O
0574374
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00006
PipeID
P00209
Time
12:55 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0192
Sewer Name
08 FIGUEROA STREET TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
20160718MDM_FIGUEROA_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
08 0153
Downstream MH
08 0152
Dir. of Survey
Downstream
Length Surveyed
363.7 ft.
Total Length
363.7 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
5242
O&M Rating
24
Overall Index
3
Overall Quick
Overall Rating
32
Pipe schematic from manhole 08 0153 to 08 0152
MH: 08 0153MH: 08 0152downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:20AM0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MWL - Water Level, 60 %of cross sectional area15.5 ft. MWL - Water Level, 70 %of cross sectional area46.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start63.5 ft. MWM - Water Mark, 90 %of cross sectional area72 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active167.8 ft. MWL - Water Level, 50 %of cross sectional area167.8 ft. MWM - Water Mark, 60 %of cross sectional area180.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start180.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish213.5 ft. MWL - Water Level, 30 %of cross sectional area213.5 ft. MWL - Water Level, 20 %of cross sectional area235.3 ft. FS - Fracture Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT238 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT242.1 ft. FC - Fracture Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES - SLIGHT250.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start262.3 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Finish - SLIGHT262.3 ft. FS - Fracture Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES, Finish - SLIGHT270.3 ft. MWL - Water Level, 50 %of cross sectional area270.3 ft. MWM - Water Mark, 60 %of cross sectional area279.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open363.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish363.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish363.7 ft. AMH - Downstream Manhole, Survey Ends - 6:15AM

Observation photos (9)

  • Water Level, 60 %of cross sectional area

    0 ft. - Water Level, 60 %of cross sectional area

  • Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    46.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

  • Water Mark, 60 %of cross sectional area

    167.8 ft. - Water Mark, 60 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    180.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, 30 %of cross sectional area

    213.5 ft. - Water Level, 30 %of cross sectional area

  • Fracture Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    235.3 ft. - Fracture Spiral, from 08 to 12 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    238 ft. - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    250.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Water Mark, 60 %of cross sectional area

    270.3 ft. - Water Mark, 60 %of cross sectional area

Observations (25)

DistanceCodeObservation
0AMH5:20AM
238FSSLIGHT
167.8MWL
15.5MWL
242.1FCSLIGHT
180.5DAGS
180.5DAGS
213.5MWL
270.3MWL
363.4DAGS
235.3FSSLIGHT
46.6DAGS
213.5MWL
0MWM
0MWL
270.3MWM
262.3FSSLIGHT
279.6TFOpen
363.7AMH6:15AM
63.5MWM
167.8MWM
262.3FSSLIGHT
72TFActive
363.4DAGS
250.4DAGS

Properties (6)

custom_field_three
SLIGHT SPRIALS JOINT TO JOINT LONGER-HIGH FLOW
custom_field_two
2
customer
LACSD
datetime
2016-07-18T00:55:42-07:00
documentation
MARTIN,MANANES-OLIVER 111
is_lateral_inspection
false