Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2016, 09:45 AM
  • H 0332_H 0331_7162016_062837.mp4

Date
07/16/2016
W/O
0580376
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00175
PipeID
P10782
Time
2:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0190
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Capital Improvement Program Assesment
Project
20160716MDM_JOINT_OUTFALL_H_UNIT_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0332
Downstream MH
H 0331
Dir. of Survey
Downstream
Length Surveyed
241.8 ft.
Total Length
241.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0332 to H 0331
MH: H 0332MH: H 0331downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - METAL PIPE THROUGH MH0 ft. AMH - Upstream Manhole, Survey Begins - 6:25AM2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT 100% 9:00 TO 3:00 START8 ft. MGP - General Photograph - MAG COAT162.1 ft. MGP - General Photograph - MAG COAT 100%162.1 ft. SAP - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG241.4 ft. MGO - General Observation - MAG COAT 100% FINISH241.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish241.8 ft. AMH - Downstream Manhole, Survey Ends - 6:50AM

Observation photos (6)

  • General Observation - METAL PIPE THROUGH MH

    0 ft. - General Observation - METAL PIPE THROUGH MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT 100% 9:00 TO 3:00 START

    2 ft. - General Observation - MAG COAT 100% 9:00 TO 3:00 START

  • General Photograph - MAG COAT

    8 ft. - General Photograph - MAG COAT

  • General Photograph - MAG COAT 100%

    162.1 ft. - General Photograph - MAG COAT 100%

  • Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    162.1 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (12)

DistanceCodeObservation
162.1MGPMAG COAT 100%
0MWM
162.1SAPSEVERE AGG
241.8AMH6:50AM
8MGPMAG COAT
0MWL
2DAGS
0MGOMETAL PIPE THROUGH MH
241.4MGOMAG COAT 100% FINISH
0AMH6:25AM
241.4DAGS
2MGOMAG COAT 100% 9:00 TO 3:00 START

Properties (6)

custom_field_three
SEVERE AGG PROJEGTING-100% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2016-07-16T02:45:48-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false