Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 15, 2016, 03:57 PM
  • 29 0516A_29 0516_7152016_090720.mp4

Date
07/15/2016
W/O
0574371
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01106
PipeID
P24566
Time
8:57 AM
Certificate
U_415_06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7182
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
20160715DF_19TH_ST_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0516A
Downstream MH
29 0516
Dir. of Survey
Downstream
Length Surveyed
286.2 ft.
Total Length
286.2 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 29 0516A to 29 0516
MH: 29 0516AMH: 29 0516downstream0 ft. AMH - Downstream Manhole, Survey Begins - 8:59AM0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area1.9 ft. CM - Crack Multiple, from 07 to 01 o'clock, within 8 inches of joint: YES2.8 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - 20% BLOCKED, OPEN7.4 ft. MGO - General Observation - CHIPPING7.4 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES11.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN16.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.4 ft. TBD - Tap Break-In Defective, at 03 o'clock, -, , within 8 inches of joint: YES, 6" - OPEN83.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"113.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"160.5 ft. MGO - General Observation - CHIPPING192.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN284.6 ft. MGO - General Observation - CHIPPING THROUGHOUT THE REACH284.6 ft. MGO - General Observation - SLIGHT GREASE THROUGHOUT THE REACH284.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.3 ft. MGO - General Observation - ROACHES @ MH286.2 ft. AMH - Downstream Manhole, Survey Ends - 9:58AM

Observation photos (4)

  • Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - 20% BLOCKED, OPEN

    2.8 ft. - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - 20% BLOCKED, OPEN

  • General Observation - CHIPPING

    7.4 ft. - General Observation - CHIPPING

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    7.4 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

    11.6 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

Observations (19)

DistanceCodeObservation
192.2TFOPEN
1.9CM
2.8TFD20% BLOCKED, OPEN
7.4MGOCHIPPING
284.6MGOCHIPPING THROUGHOUT THE REACH
285.3MGOROACHES @ MH
284.6MGOSLIGHT GREASE THROUGHOUT THE REACH
0AMH8:59AM
113.7TFA
16.4CM
11.6TBOPEN
0MWM
286.2AMH9:58AM
0MWL
7.4CL
284.6CM
83.8TF
160.5MGOCHIPPING
37.4TBDOPEN

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-07-15T08:57:27-07:00
documentation
FRANKLIN, MIRANDA
is_lateral_inspection
false