Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 2, 2016, 09:40 AM
Date
07/02/2016
W/O
0574317
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00724
PipeID
P15109
Time
2:40 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6730
Sewer Name
19 ELAINE AVENUE TRUNK
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
20160702VMR_ELAINE_AVE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
19 0077
Downstream MH
19 0076
Dir. of Survey
Downstream
Length Surveyed
318.3 ft.
Total Length
318.3 ft.
Structural Index
2
Structural Quick
2311
Structural Rating
7
O&M Index
2
O&M Quick
2C00
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
45
Pipe schematic from manhole 19 0077 to 19 0076
MH: 19 0077MH: 19 0076downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02:48 AM40.5 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: NO40.5 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: NO84.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT93.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT112.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT118.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES - CALIUM DEPOSIT157.3 ft. MGO - General Observation - SAG START159.5 ft. MGO - General Observation - SAG END174.8 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES177.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT209.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT219 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT240.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 02 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT250 ft. JOM - Joint Offset Medium251.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - ACTIVE257.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT257.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT263.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 01 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT267.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT269.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT281.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT291.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT300.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT301.3 ft. MGP - General Photograph304 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT310.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT313.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 09 to 02 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT318.3 ft. AMH - Downstream Manhole, Survey Ends - 03:26 AM

Observation photos (4)

  • Deposits Settled Other,  5 %of cross sectional area, from 09 to 11 o'clock,  , within 8 inches of joint: YES - CALCIUM DEPOSIT

    84.3 ft. - Deposits Settled Other, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT

  • Deposits Settled Other,  5 %of cross sectional area, from 09 to 12 o'clock,  , within 8 inches of joint: YES - CALCIUM DEPOSIT

    219 ft. - Deposits Settled Other, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES - CALCIUM DEPOSIT

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - ACTIVE

    251.8 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - ACTIVE

  • General Photograph

    301.3 ft. - General Photograph

Observations (31)

DistanceCodeObservation
0MWM
304DSZCALCIUM DEPOSIT
310.4DSZCALCIUM DEPOSIT
219DSZCALCIUM DEPOSIT
251.8TFACTIVE
291.2DSZCALCIUM DEPOSIT
112.6DSZCALCIUM DEPOSIT
267.1DSZCALCIUM DEPOSIT
118.5DSZCALIUM DEPOSIT
157.3MGOSAG START
313.9DSZCALCIUM DEPOSIT
40.5CL
177.9DSZCALCIUM DEPOSIT
93.7DSZCALCIUM DEPOSIT
301.3MGP
263.4DSZCALCIUM DEPOSIT
269.6DSZCALCIUM DEPOSIT
257.1DSZCALCIUM DEPOSIT
300.8DSZCALCIUM DEPOSIT
0MWL
174.8CL
318.3AMH03:26 AM
84.3DSZCALCIUM DEPOSIT
240.6DSZCALCIUM DEPOSIT
281.9DSZCALCIUM DEPOSIT
209.4DSZCALCIUM DEPOSIT
40.5CL
0AMH02:48 AM
159.5MGOSAG END
257.1DSZCALCIUM DEPOSIT
250JOM

Properties (4)

custom_field_two
4
customer
LACSD
datetime
2016-07-02T02:40:05-07:00
is_lateral_inspection
false