Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2020, 10:07 AM
  • 02 0413_02 0412 _08102020_032007.mp4

Date
08/10/2020
W/O
844559
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00256
PipeID
P02735
Time
3:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7900
Sewer Name
DOWNEY-BELLFLOWER RELIEF TRUNK, SECTION 4
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
WO_844559_TV02193_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
21 in.
Upstream MH
02 0413
Downstream MH
02 0412
Dir. of Survey
Downstream
Length Surveyed
294.3 ft.
Total Length
294.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
290
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
414
Pipe schematic from manhole 02 0413 to 02 0412
MH: 02 0413MH: 02 0412downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 04130 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.5 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"69.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"75.3 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"80.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN167 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"178 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"208.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"237.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN254 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN273.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"292 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish292.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish294.3 ft. AMH - Downstream Manhole, Survey Ends - 02 0412294.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
254TFOPEN
69.3TBA
292.1DAGS
0AMH02 0413
294.3AMH02 0412
178TBC
2DAGS
237.9TBOPEN
75.3TBC
208.3TBA
167TBA
273.8TBC
0MWM
292.1CM
0MWL
2SSS
80.6TBOPEN
292SSS
28.5TBC
294.3MGOCONN @ MH 3 O'CLOCK/OPEN
2CM

Properties (6)

additional_info
SC411740
custom_field_two
3
customer
1
datetime
2020-08-10T03:07:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false