Wastewater/Activity/PacpInspection/1.0Sep 3, 2020, 06:19 AM
  • 19 0071_19 0070_09032020_002445.mp4

Date
09/02/2020
W/O
844369
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00724
PipeID
P15103
Time
11:19 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7977
Sewer Name
ELAINE AVENUE TRUNK
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_844369_TV19073_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
19 0071
Downstream MH
19 0070
Dir. of Survey
Downstream
Length Surveyed
309.9 ft.
Total Length
309.9 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
312V
O&M Rating
237
Overall Index
2
Overall Quick
Overall Rating
542
Pipe schematic from manhole 19 0071 to 19 0070
MH: 19 0071MH: 19 0070downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 19 00710 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start44.9 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"48.3 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start91.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.2 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"96 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES144.1 ft. TBC - Tap Break-In Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"147.2 ft. TBC - Tap Break-In Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"190.2 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 6" - ACTIVE193.3 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"242.7 ft. TBI - Tap Break-In Intruding, at 12 o'clock, -, #v, within 8 inches of joint: NO, 6", 3" - ACTIVE244.8 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"247.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"268 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES293.7 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"297.1 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"307 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish308.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.9 ft. MGO - General Observation - CONN @ MH 9 O;CLOCK/CAPPED309.9 ft. AMH - Downstream Manhole, Survey Ends - 19 0070309.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE309.9 ft. MGO - General Observation - ROACHES @ MH

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    91.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 12 o'clock, -, #v, within 8 inches of joint: NO, 6", 3" - ACTIVE

    242.7 ft. - Tap Break-In Intruding, at 12 o'clock, -, #v, within 8 inches of joint: NO, 6", 3" - ACTIVE

  • General Observation - ROACHES @ MH

    309.9 ft. - General Observation - ROACHES @ MH

Observations (32)

DistanceCodeObservation
91.3DAE
94.2TBC
297.1TBC
268DAE
308.1CM
193.3TBC
44.9TBC
2SSS
91.3TBA
247.7TBC
309.9MGOCONN @ MH 9 O;CLOCK/CAPPED
309.9AMH19 0070
242.7TBIACTIVE
2CM
308.1DAE
2DAGS
308.1DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
307SSS
96DAE
309.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
0AMH19 0071
309.9MGOROACHES @ MH
144.1TBC
190.2TBIACTIVE
293.7TBC
147.2TBC
244.8TBC
0MWL
48.3TBC
0MWM
0MGOROACHES @ MH

Properties (7)

additional_info
SC411868
custom_field_three
MULTIPLE CRACKS/ENCRUSTATION
custom_field_two
2
customer
1
datetime
2020-09-02T23:19:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false