Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 3, 2020, 08:23 AM
  • 19 0275_19 0274_09032020_014646.mp4

Date
09/03/2020
W/O
844361
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00732
PipeID
P15245
Time
1:23 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7979
Sewer Name
209TH STREET TRUNK
City
LAKEWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_844361_TV19069_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
19 0275
Downstream MH
19 0274
Dir. of Survey
Downstream
Length Surveyed
410.2 ft.
Total Length
410.2 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
408
O&M Index
2
O&M Quick
312Q
O&M Rating
184
Overall Index
2
Overall Quick
Overall Rating
592
Pipe schematic from manhole 19 0275 to 19 0274
MH: 19 0275MH: 19 0274downstream0 ft. AMH - Upstream Manhole, Survey Begins - 19 02750 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES37.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"47.1 ft. RFC - Roots Fine Connection, from 01 to 03 o'clock, within 8 inches of joint: YES47.1 ft. TBD - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: YES, 4", 6" - 75% ROOTS-LATERAL/ACTIVE65.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"241.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"286.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN338.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"341.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"360.9 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start386.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN389.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"407.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish407.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish407.9 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish408 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish410.2 ft. AMH - Downstream Manhole, Survey Ends - 19 0274

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Roots Fine Connection, from 01 to 03 o'clock, within 8 inches of joint: YES

    47.1 ft. - Roots Fine Connection, from 01 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    360.9 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (33)

DistanceCodeObservation
7CM
137.7TFA
386.5TFOPEN
0AMH19 0275
289.3TFOPEN
407.9CM
241.1TFC
2DAGS
0MGOROACHES @ MH
140.8TFC
407.9DAGS
0MWM
2SSS
338.1TFC
286.2TFC
389.5TFC
47.1RFC
360.9DAE
0MWL
410.2AMH19 0274
189.7TFA
47.1TBD75% ROOTS-LATERAL/ACTIVE
237.9TFC
2CM
408SSS
37.9TFC
89.7TFC
186.4TFC
341.1TFA
86.6TFC
65.4TFA
407.9DAE
0MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (7)

additional_info
SC411870
custom_field_three
MULTIPLE CRACKS/ENCRUSTATION
custom_field_two
2
customer
1
datetime
2020-09-03T01:23:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false