Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 27, 2020, 06:21 AM
  • 16 0163_16 0162_08272020_000145.mp4

Date
08/26/2020
W/O
844349
Weather
Dry
Operator/Surveyor
JOSE GONZALEZ
Sewer ID
Z00648
PipeID
P13195
Time
11:21 PM
Certificate
U-0720-70309215
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7968
Sewer Name
ARROYO SECO TRUNK, SECTION 5
City
S. PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_844349_TV16081_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
16 0163
Downstream MH
16 0162
Dir. of Survey
Downstream
Length Surveyed
524.6 ft.
Total Length
524.6 ft.
Structural Index
3
Structural Quick
3T22
Structural Rating
317
O&M Index
2
O&M Quick
2T00
O&M Rating
208
Overall Index
2
Overall Quick
Overall Rating
525
Pipe schematic from manhole 16 0163 to 16 0162
MH: 16 0163MH: 16 0162downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 01632 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"80.8 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES89 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"147.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"199.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"269 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"327.8 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"376.4 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"446.8 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"520.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish520.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish522 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish524.6 ft. AMH - Downstream Manhole, Survey Ends - 16 0162

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

    80.8 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
147.6TBA
80.8CC
327.8TBA
0MWM
520.5CM
199.3TBA
2CM
89TBA
446.8TBA
0MWL
524.6AMH16 0162
269TBA
0AMH16 0163
2DAGS
2SSS
520.5DAGS
35.6TBA
522SSS
376.4TBA

Properties (6)

additional_info
SC411859
custom_field_two
3
customer
1
datetime
2020-08-26T23:21:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false