Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 14, 2020, 05:02 AM
Date
08/13/2020
W/O
844482
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00306
PipeID
P03611
Time
10:02 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7955
Sewer Name
TELEGRAPH ROAD TRUNK
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
21
Purpose
Routine Assessment
Project
WO_844360_TV02116_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
24 in.
Upstream MH
02 1039
Downstream MH
02 1040
Dir. of Survey
Upstream
Length Surveyed
298 ft.
Total Length
298 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
413
Pipe schematic from manhole 02 1039 to 02 1040
MH: 02 1039MH: 02 1040upstream0 ft. RPZD - Repair Other Defective, within 8 inches of joint: YES - LINK PIPE0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE. DEFECTIVE LINK PIPE.0.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.8 ft. RPZ - Repair Other, within 8 inches of joint: YES - LINK PIPE0.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish54 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"107.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"155.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"181.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"236.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"283.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"288.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start296 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start296 ft. CM - Crack Multiple, from 08 to 12 o'clock, within 8 inches of joint: YES298 ft. MWM - Water Mark, 15 %of cross sectional area298 ft. AMH - Downstream Manhole, Survey Ends - 02 1039298 ft. MGO - General Observation - ROACHES @ MH298 ft. MWL - Water Level, 10 %of cross sectional area298 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"

Observations (22)

DistanceCodeObservation
0MWM
2SSS
0AMH02 1039
296.6TFC
0MGOROACHES @ MH
297.2CM
14.6TFA
116.5TFC
298RPZDLINK PIPE
295SSS
190.4TFC
2DAGS
0MWL
0TFC
297.2RPZLINK PIPE
298MSAREVERSAL COMPLETE. DEFECTIVE LINK PIPE.
2CM
142.8TFC
244TFC
297.2DAGS
9.4CM
61.8TFC

Properties (7)

additional_info
SC411745
custom_field_three
MULTIPLE CRACKS/DEFECTIVE LINK PIPE.
custom_field_two
3
customer
1
datetime
2020-08-13T22:02:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false