Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 08:37 AM
  • 18 0826_18 0825_08122020_014936.mp4

Date
08/12/2020
W/O
844412
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00707
PipeID
P14689
Time
1:37 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7953
Sewer Name
SO WHITTIER OUTFALL TR, SECT 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_844412_TV18119_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0826
Downstream MH
18 0825
Dir. of Survey
Downstream
Length Surveyed
239.9 ft.
Total Length
239.9 ft.
Structural Index
3
Structural Quick
4H3H
Structural Rating
423
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
3
Overall Quick
Overall Rating
517
Pipe schematic from manhole 18 0826 to 18 0825
MH: 18 0826MH: 18 0825downstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 08260 ft. MGO - General Observation - ROACHES @ MH2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"35.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"69.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"166.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"215.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"237 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish237 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish237.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish237.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish239 ft. MGO - General Observation - ROACHES @ MH239.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE239.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0825

Observation photos (3)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
2CM
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
35.8TFC
69.9TFC
239.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
237CM
237.7DAGS
237.7FM
116.4TFC
66.3TFA
239MGOROACHES @ MH
2SSS
168.9TFC
32.7TFA
239.9AMH18 0825
5.1FM
113.4TFC
0MWL
0MWM
0AMH18 0826
166.1TFA
0MGOROACHES @ MH
2DAGS
215.1TFC
218.4TFC
237SSS

Properties (7)

additional_info
SC411743
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-08-12T01:37:20-07:00
documentation
PRO PIPE
is_lateral_inspection
false