Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2020, 08:49 AM
  • 18 0825_18 0824_08122020_015955.mp4

Date
08/12/2020
W/O
844412
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00707
PipeID
P14688
Time
1:49 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7953
Sewer Name
SO WHITTIER OUTFALL TR, SECT 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_844412_TV18119_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0825
Downstream MH
18 0824
Dir. of Survey
Downstream
Length Surveyed
128.2 ft.
Total Length
128.2 ft.
Structural Index
3
Structural Quick
4D3D
Structural Rating
221
O&M Index
2
O&M Quick
2D00
O&M Rating
50
Overall Index
3
Overall Quick
Overall Rating
271
Pipe schematic from manhole 18 0825 to 18 0824
MH: 18 0825MH: 18 0824downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 08252 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"28.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"78 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN81.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"123.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish126 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish126 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish126.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish128 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED128.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0824128.2 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    128.2 ft. - General Observation - ROACHES @ MH

Observations (20)

DistanceCodeObservation
128MGOCONN @ MH 9 O'CLOCK/CAPPED
2DAGS
28.2TFC
2SSS
118.8TBA
126.4DAGS
123.3FM
2CM
128.2AMH18 0824
0MWL
78TFOPEN
126SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
5.2FM
126CM
0MWM
128.2MGOROACHES @ MH
25.4TFC
0AMH18 0825
81.2TFC

Properties (7)

additional_info
SC411743
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2020-08-12T01:49:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false