Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2020, 06:15 AM
  • 22 0970_22 0969_08032020_233122.mp4

Date
08/03/2020
W/O
844347
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00790
PipeID
P17340
Time
11:15 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7896
Sewer Name
BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_844347_TV22002_AUG2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0970
Downstream MH
22 0969
Dir. of Survey
Downstream
Length Surveyed
326.6 ft.
Total Length
326.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 22 0970 to 22 0969
MH: 22 0970MH: 22 0969downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 09702 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.7 ft. MGO - General Observation - 60% MAG COAT4.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"245.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. MGO - General Observation - ROACHES @ MH324.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish326.6 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE326.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0969

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 60% MAG COAT

    4.7 ft. - General Observation - 60% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    324.3 ft. - General Observation - ROACHES @ MH

Observations (20)

DistanceCodeObservation
326.6MGOCONN @ MH 9 O'CLOCK/ACTIVE
95.8TFC
0MGOROACHES @ MH
148.4TFC
324.3MGOROACHES @ MH
324.3SSS
4.7SAV
298TFC
4.7MGO60% MAG COAT
0MWL
0MWM
326.6AMH22 0969
245.5TFC
0AMH22 0970
47.3TFC
324.3SAV
4.7SSS
2DAGS
200.9TFC
324.3DAGS

Properties (7)

additional_info
SC411736
custom_field_three
SPALLING/VISIBLE AGGREGATE
custom_field_two
3
customer
1
datetime
2020-08-03T23:15:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false