Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 4, 2020, 09:04 AM
  • 22 0968_22 0967_08042020_021536.mp4

Date
08/04/2020
W/O
844347
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00790
PipeID
P17338
Time
2:04 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7896
Sewer Name
BASE LINE TRUNK
City
GLENDORA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
RFIR_WO_844347_TV22002_AUG2020
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0967
Downstream MH
22 0968
Dir. of Survey
Upstream
Length Surveyed
266.1 ft.
Total Length
266.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
2I00
O&M Rating
104
Overall Index
2
Overall Quick
Overall Rating
364
Pipe schematic from manhole 22 0967 to 22 0968
MH: 22 0967MH: 22 0968upstream0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Ends - 22 09680 ft. MGO - General Observation - ROACHES @ MH2.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish56.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"229.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.8 ft. MGO - General Observation - 65% MAG COAT264.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start264.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start264.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start266.1 ft. MWL - Water Level, 15 %of cross sectional area266.1 ft. MGO - General Observation - ROACHES @ MH266.1 ft. AMH - Downstream Manhole, Survey Begins - 22 0967266.1 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 65% MAG COAT

    24.3 ft. - General Observation - 65% MAG COAT

  • General Observation - ROACHES @ MH

    266.1 ft. - General Observation - ROACHES @ MH

Observations (16)

DistanceCodeObservation
263.8SAV
2DAGS
24.3MGO65% MAG COAT
2SAV
263.8SSS
0MWL
0MGOROACHES @ MH
210TFC
266.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
266.1AMH22 0968
0AMH22 0967
263.8DAGS
266.1MGOROACHES @ MH
0MWM
2SSS
36.6TFC

Properties (7)

additional_info
SC411736
custom_field_three
SPALLING/VISIBLE AGGREGATE
custom_field_two
2
customer
1
datetime
2020-08-04T02:04:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false