Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 7, 2020, 07:45 AM
  • 05 2453A_05 2453_08072020_005319.mp4

Date
08/07/2020
W/O
844506
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00457
PipeID
P20849
Time
12:45 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7941
Sewer Name
IMPERIAL HIGHWAY EXTENSION TRUNK
City
inglewood
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
09
Purpose
Routine Assessment
Project
WO_844506_TV05036_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
05 2453
Downstream MH
05 2453A
Dir. of Survey
Upstream
Length Surveyed
178.3 ft.
Total Length
178.3 ft.
Structural Index
2
Structural Quick
2F00
Structural Rating
70
O&M Index
2
O&M Quick
2F00
O&M Rating
70
Overall Index
2
Overall Quick
Overall Rating
140
Pipe schematic from manhole 05 2453 to 05 2453A
MH: 05 2453MH: 05 2453Aupstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 2453A2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish176.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start176.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start178.3 ft. MWM - Water Mark, 25 %of cross sectional area178.3 ft. MWL - Water Level, 20 %of cross sectional area178.3 ft. AMH - Downstream Manhole, Survey Begins - 05 2453

Observations (8)

DistanceCodeObservation
2SSS
0MWM
176DAGS
176SSS
0MWL
178.3AMH05 2453A
2DAGS
0AMH05 2453

Properties (6)

additional_info
SC411803
custom_field_two
3
customer
1
datetime
2020-08-07T00:45:02-07:00
documentation
PROPIPE
is_lateral_inspection
false