Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 10, 2020, 09:43 AM
  • 05 1397_05 1396_08102020_025616.mp4

Date
08/10/2020
W/O
844677
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06618
Time
2:43 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7943
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
RFIR_WO_844677_TV05074_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
18 in.
Upstream MH
05 1396
Downstream MH
05 1397
Dir. of Survey
Upstream
Length Surveyed
319.7 ft.
Total Length
319.7 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
315
O&M Index
2
O&M Quick
2L00
O&M Rating
132
Overall Index
2
Overall Quick
Overall Rating
447
Pipe schematic from manhole 05 1396 to 05 1397
MH: 05 1396MH: 05 1397upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 13970 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE0 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/OPEN0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.7 ft. MGO - General Observation - ROACHES @ MH2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish69.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.7 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 75% GREASE-LATERAL/OPEN154.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN201.7 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - 85% GREASE-LATERAL/UNKNOWN245.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN295.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES295.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"313.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start317.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start317.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start319.7 ft. MWL - Water Level, 20 %of cross sectional area319.7 ft. AMH - Downstream Manhole, Survey Begins - 05 1396319.7 ft. MWM - Water Mark, 25 %of cross sectional area319.7 ft. MGO - General Observation - ROACHES @ MH

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    24.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

Observations (21)

DistanceCodeObservation
118TFD85% GREASE-LATERAL/UNKNOWN
164.9TFOPEN
317DAGS
0MWL
0AMH05 1396
319.7AMH05 1397
250.3TFC
319.7MGOCONN @ MH 3 O' CLOCK/ACTIVE
319MGOROACHES @ MH
5.8CM
319.7MGOCONN @ MH 9 O' CLOCK/OPEN
317SSS
319.7CM
24.3DAGS
2DAGS
0MWM
24.3TFA
2SSS
0MGOROACHES @ MH
204TFD75% GREASE-LATERAL/OPEN
73.9TFOPEN

Properties (7)

additional_info
SC411805
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-08-10T02:43:04-07:00
documentation
PROPIPE
is_lateral_inspection
false