Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2020, 06:04 AM
  • 05 1381_05 1380_08102020_232041.mp4

Date
08/10/2020
W/O
844677
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00487
PipeID
P06601
Time
11:04 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7945
Sewer Name
MONETA TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_844677_TV05074_AUG2020
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
05 1381
Downstream MH
05 1380
Dir. of Survey
Downstream
Length Surveyed
390 ft.
Total Length
390 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
2
O&M Quick
2O00
O&M Rating
160
Overall Index
2
Overall Quick
Overall Rating
545
Pipe schematic from manhole 05 1381 to 05 1380
MH: 05 1381MH: 05 1380downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 13810 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.2 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - 60% GREASE-LATERAL/ACTIVE126.1 ft. RTL - Roots Tap Lateral, at 10 o'clock, 10 %, within 8 inches of joint: YES126.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - TAP ROOT-LATERAL/OPEN167.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"205.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN216.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"249 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN287.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"338.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"388 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish388 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish390 ft. AMH - Downstream Manhole, Survey Ends - 05 1380390 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish390 ft. MGO - General Observation - CONN @ MH 9 O' CLOCK/ACTIVE

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
126.1RTL
2DAGS
216.1TFC
0MWM
338.1TFC
388SSS
85.2TFD60% GREASE-LATERAL/ACTIVE
390AMH05 1380
0AMH05 1381
0MWL
205.8TFOPEN
287.3TFC
126.1TFDTAP ROOT-LATERAL/OPEN
249TFOPEN
2SSS
44.1TFC
4.6CM
390CM
390MGOCONN @ MH 9 O' CLOCK/ACTIVE
167.2TFA
388DAGS

Properties (7)

additional_info
SC411807
custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2020-08-10T23:04:46-07:00
documentation
PROPIPE
is_lateral_inspection
false